Loading Materials to Working Level
David Maxwell - 1989 - Antarcticans Database Project - more

Back to thumbnails   Previous     Next   

Loading Materials to Working Level

One of the many challenging tasks faced by the team was the loading up of the numerous floor and wall panels onto the main accomodation platform which often required using both the Nodwell lift arms in tandem to not only support the weight of parts but also gain the required height for the lift.

Halley V - 5 Construction, summer of 1989/1990.

Largest available file size



Photo; © David Maxwell