A movable arch was then erected spanning the trench
Philip K Swartz - 1960-61 - South Pole Station - Antarcticans Database Project more

Back to thumbnails   Previous     Next   

A movable arch was then erected spanning the trench

Metal arch pieces then placed, and the stored snow was then packed over the arch, and the arch moved further along the trench; thus creating a tunnel that was supposed to be self-supporting.



Pictures from Philip K Swartz, overwinter, South Pole, 60-61